|
Product Detail :
|
Design and Construction of 3x50 Mtr Span Bridge on Heff Achan Road (on EPC Mode). The job includes Surveying, Soil Investigation, designing (to be vetted by design Directorate /IIT/NIT), construction of Diversion, Load Testing...
|
| Tender Detail : |
Design and Construction of 3x50 Mtr Span Bridge on Heff Achan Road (on EPC Mode). The job includes Surveying, Soil Investigation, designing (to be vetted by design Directorate /IIT/NIT), construction of Diversion, Load Testing... #*. Design and Construction of 3x50 Mtr Span Bridge on Heff Achan Road (on EPC Mode). The job includes Surveying, Soil Investigation, designing (to be vetted by design Directorate /IIT/NIT), construction of Diversion, Load Testing... |